A strategic corridor bridging the Northern Key Economic Region

WHA Smart Technology Industrial Zone - Thanh Hoa will harness innovative technologies to deliver best-in-class environmental protection and drive economic growth. The design incorporates reliable utilities, advanced environmental management systems, and energy-efficient technologies to meet green certification standards.

Wastewater Treatment Plant
Water Supply
Land Elevation
Drainage and Flood Control System
Road System
Power Supply by EVN
Telecommunication
Firefighting System
  • MBBR technology
  • Treatment Capacity: 12,000 m3/day

Raw Water

  • Nam Song Ma 60,900 m3/hour

Treated Water Supply

  • Current Sources: Hoang Hoa Water Treatment Plant 11,200 m³/day Hoang Xuan Water Treatment Plant 3,600 m³/day
  • Future Source: WHA Water Treatment Plant developed by WHA UP 21,000 m³/day
  • Standard Supply: 45 m3 /ha/day
  • Back-up Water Storage Tank: On-site reservoir Phase 1: 5,000 m³ Phase 2: 5,000 m³

High Quality Standard Developed Land
Soil Compaction: Modified Proctor Standard K90, compacted with high-quality soil, to prevent soil settlement
Land Elevation: +2.0 to +2.25 meters above MSL

High Quality Standard Infrastructure
Dike System: Height: +3.05 meters above MSL
Surrounding the Industrial Zone (IZ)
Retention Ponds:
Total Area: 14 hectares
Total Capacity: 390,000
cubic meters:

  • Phase 1: 3 hectares
  • Phase 2: 5 hectares
  • Phase 3: 6 hectares

High Quality Standard Infrastructure
Pump Stations:

  • Total Capacity: 30 cubic meters per second
  • First Station: 16 cubic meters per second
  • Second Station: 14 cubic meters per second

Drainage Channel:

  • Width: 7-17 meters
  • Depth: 2-3 meters

Internal Road Infrastructure
Main Road: 66 meters wide, 6 lanes
Second Road: 54,47,35 meters wide, 4 lanes
Reinforced Concrete Pavement Road:

  • Quality: Reinforced concrete M350
  • Thickness: 25cm
  • Heigh: +2.1meters above MSL or higher
  • LED Street Lighting system

Current Supply
Hoang Long 110kV substation

  • Transmission line: 22Kv
  • Straight-line distance to WHAIZ: 4Km
  • Capacity: 2x63 MVA

Future Supply (Expect Q2/2026)
Hau Loc 220kV substation

  • Status: Planning
  • Straight-line distance to WHAIZ: 9Km
  • Capacity: 2x250 MVA

Future Supply (Expect Q2/2026)
WHA 110kV substation

  • Status: under planning
  • Target completion: 2026
  • Capacity: 3*63 MVA
  • Fire station with 3 units of Fire truck and firefighter team (work 24/7)
  • Fire hydrant every 150 meters along internal roads
  • Water Storage Tank with capacity of 10,000 Cubic meters, enough for firefighting water reservation requirement by laws and remaining for the Industrial use
  • 1 Provincial Fire Stations within 12 km from WHAIZ

Solar panels installed for Energy Saving

  • On-Line Monitoring Room : To manage IZ Operation, Security, Maintenance and Environmental Monitoring
  • Fire Fighting Station : 24hrs/7days operation with Emergency Team stand by, locating next to Site office
  • Commercial Area : Land being reserved for Commercial Area next to the Office, to be developed soon